Skip to content
Customer case.

Magazine X.

Tactile stainless steel handrails & contrasting floor, window and glass markings.

All about sustainability. Naturally.

A building like no other.

Magasin X was completed in early 2022 and is now Sweden’s largest office building with a frame made entirely of wood. The building, which is owned by Vasakronan, is unique in its kind and has not only contributed to Uppsala Municipality’s vision of creating long-term sustainable office solutions – but also set the bar for future buildings.

For White, the architectural firm behind the project, it was quickly clear: Raw materials, visible construction details and carefully selected details that contribute to the clean, authentic and natural feel are essential. As durable as the building is, the feeling inside should be too.

Magasin X is a large project with many parties involved, including ourselves. What unites everyone is the desire for change, and not least improvement – a vision of a sustainable future. Together, we have laid the foundations for the buildings of the future.

Our contribution: an important detail.

Working closely with the architectural firm, we have ensured that the building meets the accessibility requirements for buildings today. We are well versed in the process and understand that our products are a small but important part of the whole. We therefore take our responsibility and do everything we can to make the process smoother. In this particular project, that meant:

  • Providing expertise and guidance to the architect on the correct placement, dimensions and distances between products, fixing methods and installation advice to easily specify the products in the drawings.
  • Produce tailor-made handrails and contrast markings that matched the wishes and needs.
  • Be available for questions and concerns that arose during the project, of course.
  • Deliver and install the products according to the drawings.

Teknisk info


New construction
Accessibility adaptations

Uppsala

NCC

White architects

Safestep FÅLHAGEN

Safestep SALA BACKE

Safestep ERIKSBERG

360

108

50 / 1 000 st

1 000 lpm

Contrast marking in vinyl
Customized design
Tactile stainless steel walkways that clearly mark key destinations on the ground floor, such as the elevator, stairs, toilets and reception.
Specially designed window foils go hand in hand with the concept.
The foils are available in three different variants: stripped contrast marking, wider foils that contribute to partial privacy and full foils that provide full privacy from floor to ceiling.

Would you like to know more about the project?

Call us

Discover other customer cases


Uppsala City Hall.

Old is the new new.

Tactile stainless steel handrails.

Humlegårdsgatan 6.

Stainless steel is the new black.

Contrast marking stairs and floor.

Östermalm market hall.

Bring back the history.

Tactile handrails and brass contrast markings.

Den som väntar på något gott...

Sidan finns tyvärr inte än.

Välkommen tillbaka inom kort!

Quote list

Drag files here or click to upload
Max 4 files, max 5MB per file
File types: jpg, png, pdf
Thank you for your inquiry!
We will get back to you as soon as possible.

Favorites

Trial box

Fill in the form and we will send you a trial box.

The trial box contains a selection of our most popular products.

We will contact you to confirm your order.

The trial box is free of charge and you are not committed to anything.

Thank you for your inquiry!
We will get back to you as soon as possible.

3D files

Fill in the form to download our 3D files.

Download starts automatically!