The municipality of Österåker, close to nature and just northeast of Stockholm, is one multi-purpose hall richer. It took 26 months for the developer Armada Kommunfastigheter together with the turnkey contractor In3prenör to complete the 13,000 m2 building, which consists of no less than six sports halls, cafés, social areas and meeting rooms.

When you hear that, 26 months suddenly doesn’t sound like such a long time. Especially when you also start thinking about how many different functions the new building fulfills. There’s everything from regular basketball courts and gymnasiums, to high climbing walls and large stands that can hold up to 2000 spectators.

No, when you start to get a taste of it, it’s actually very impressive that it’s happened so quickly. So many different parts, steps and actors were called in to complete the building – and yet such a smooth process.

A unique project.

The multi-arena is something extraordinary – as a finished building but also as a construction project. It’s also one of the largest projects we’ve been involved in. As the fast construction time suggests, it was also important for us to act efficiently, so when In3prenör contacted us at the beginning of December 2021, we quickly agreed: Contrast markings in stainless steel with black PVD coating for sufficient contrast against the substrate, while at the same time getting a nice and durable finish. To withstand as high a load as possible, we chose markings with pins, which are drilled into the floor and fixed with mounting glue. In addition, we decided to match the contrasting markings with stainless steel rods with black inserts.

Two weeks after we started the work, 3000 contrast markers and 520 guide rods were installed, just in time for the inspection.

Teknisk info


New construction

Österåker

In3contractor

Safestep KÅBO,
stainless steel with black inserts

Safestep SVARTBÄCKEN,
PVD-treated steel

Safestep SALA BACKE,
polyurethane contrast marking

520 p

3 000 pcs / 320 pcs
The PVD-coated contrast markings provide a clear contrast against the wooden staircase. The coating also provides a durable surface that allows the markings to withstand very high loads.
The handrails are made of stainless steel and have a black polyurethane coating that ensures a clear contrast with the light-colored floor and goes hand in hand with the black contrast markings. The handrails are also fitted with pins that are drilled and glued to the floor.
Contrast polyurethane markings highlight level differences in the stone floor.

Would you like to know more about the project?

Call us

Discover other customer cases


City of Malmö.

Built to last.

Fiberglass grating – GRP.

Yasuragi.

Slip free zen mode.

Heating mats & anti-slip mats for spas.

Kristinebergs IP.

It's the little things.

Anti slip and contrast marking.

Den som väntar på något gott...

Sidan finns tyvärr inte än.

Välkommen tillbaka inom kort!

Quote list

Drag files here or click to upload
Max 4 files, max 5MB per file
File types: jpg, png, pdf
Thank you for your inquiry!
We will get back to you as soon as possible.

Favorites

Trial box

Fill in the form and we will send you a trial box.

The trial box contains a selection of our most popular products.

We will contact you to confirm your order.

The trial box is free of charge and you are not committed to anything.

Thank you for your inquiry!
We will get back to you as soon as possible.

3D files

Fill in the form to download our 3D files.

Download starts automatically!